Is the Hooker Valley Track open?
Check Hooker Valley Track access, the new 189 m swing bridge, walking times and what to know before visiting Aoraki/Mount Cook.
Yes: the Hooker Valley Track was open to Hooker Lake when we checked on 16 November 2026, and DOC’s track page listed no alert or closure. You can walk to Hooker Lake, at the foot of Aoraki/Mount Cook, across all three swing bridges, as you have been able to since the new second bridge opened on 28 July 2026. Heavy rain or high wind can still close the track at short notice, so check DOC on the day. If you are coming without a car, the Tekapo Shuttle day tour from Lake Tekapo refunds you in full if the track is completely closed.
Check Availability

Track and road status on 16 November 2026
Last checked: 16 November 2026, against DOC’s track page and the NZ Transport Agency’s road feed. This is a dated check and it does not update itself.
| What | Status when checked |
|---|---|
| Hooker Valley Track to Hooker Lake | The full track is open. No alert or closure on DOC’s page |
| First swing bridge | Open, with a 20-person limit |
| SH80 (Mount Cook Road) | No closure, incident or roadworks listed |
| SH8 between Lake Tekapo, Twizel, Omarama and the Lindis Pass | No closure, incident or roadworks listed |
| InterCity buses | No delayed or cancelled services listed |
Older guides and some operator pages still say the track is closed past the first bridge. That ended on 28 July 2026.
How to check on the morning you walk
Start with DOC’s Hooker Valley Track page. The Department of Conservation (DOC) manages the track, and its page is the authority on closures: DOC says it “will be updated when any closures are in place”. The visitor centre in the village, at 1 Larch Grove (+64 3 435 1186), has the same information and opens daily from 8:30am to 5pm from October to April and 8:30am to 4:30pm from May to September.
Then check the road. State Highway 80 is the only road into the village, and DOC’s warning is plain: “Snow can close SH80. Check highway conditions before you travel.” The NZ Transport Agency posts closures at journeys.nzta.govt.nz.
Check the Aoraki/Mount Cook National Park forecast the night before as well. DOC links both NIWA’s and MetService’s. A forecast of heavy rain is the one to take seriously, for the reason below.
Why the track closes
DOC closes the track in heavy rain or high wind. In 2022, after heavy rain eroded the riverbank, it said it “has lowered the threshold for closing the track when heavy rain is forecast” and that visitors “can expect that there will be times when the track’s closed”. That policy was set in 2022 and DOC has not published a new one for the new bridge.
When the track is closed, DOC says, “there is no alternative track into the valley, and it is not considered safe to cross the river”. The first kilometre, to the gate at the first bridge, stays open. So on a closure day you can still walk to Mueller Lookout and the first swing bridge and back, which takes about half an hour.
What changed, and when
| Date | What happened |
|---|---|
| March 2019 | A storm damages the old second bridge |
| 24 August to 1 September 2022 | The track closes after heavy rain erodes the riverbank |
| Easter 2025 | The old second bridge closes after heavy rain. DOC shuts it for good on 23 April 2025 |
| 16 May 2025 | The lower track reopens as far as a viewing platform over Mueller Lake |
| 2 July 2026 | DOC confirms that paid parking at White Horse Hill continues |
| 28 July 2026 | The new second bridge opens to the public at 3pm, after a blessing by mana whenua. The full track reopens |
| 22 September 2026 | DOC says the 20-person limit on the first bridge will be enforced, with gates to come |
The upper track stayed closed for 15 months. During the build DOC installed security cameras and warned that trespass notices could be issued to people climbing the barriers.
DOC’s description of the replacement: “At 189 metres, it’s the longest suspension bridge in New Zealand.” Its designer, Dan Crocker of DC Structures Studio, goes further: “it’s the longest single span footbridge of any kind in the country.” The project cost NZ$4.85 million. The route guide shows where the bridge falls on the walk.
The 20-person limit on the first bridge
The first swing bridge has a 20-person limit. In September 2026 DOC said engineers had found cable wear on the 47-year-old bridge, and that it would fit self-closing gates at each end and roster rangers there at peak times over summer. DOC has given no date for the gates. Its position is that the bridge “is safe to cross but the people limit needs to be followed”, so on a busy day expect to wait your turn.
If you are on a tour when the track closes
Tours handle a closure differently, so read the listing before you book. The Tekapo Shuttle day tour (from US$93 per person, 4.9/5 from 440+ reviews on GetYourGuide) states a full refund if the track is completely closed, and it supplies snow spikes when the track is snowy. Our breakdown of the Tekapo Shuttle day has its timetable.
The Cheeky Kea day tour from Christchurch states that it runs in all weather except road closures and offers a refund when a road closure stops the tour. Its listing does not say what happens if the road is open and the track is shut, so ask before you book. Hooker Valley Track tours compares the rest.
What to walk when the valley is shut
Kea Point Track starts from the same car park and takes 1 hour return. Tasman Glacier View Track, a 10-minute drive from the village, is 1.5 km and 30 minutes return, with what DOC calls a “Steep climb with 300+ steps to viewpoint”. In poor weather DOC suggests Governors Bush Walk as “a sheltered place to experience the outdoors”. Hooker Valley, Tasman Glacier or Kea Point compares them.
Roadworks on the drive in
From the NZ Transport Agency’s feed, checked 16 November 2026:
- From Christchurch, SH79 between Geraldine and Fairlie: stop/go pavement repairs on weekdays from 6am to 5pm, with delays of up to 5 minutes, until Friday 20 November 2026. On Tuesday 17 November, near Pusey Road, delays of up to 20 minutes.
- From Queenstown, SH6 at Nevis Bluff: rock scaling on weekdays from 8am to 5pm, with traffic held for up to 10 minutes at a time, until 20 November 2026.
- Returning to Christchurch late, SH1 at Ashburton: night works with stop/go from 7pm to 6am, from 22 November to 14 December 2026.
The proposed access charge
An access charge for international visitors at Aoraki/Mount Cook is proposed, not in force. It needs the Conservation Amendment Bill, which as of 16 November 2026 has had only its first reading (12 May 2026). No price has been set. The track is free to walk; the only charge at the trailhead is parking at White Horse Hill.
On the day
Open DOC’s page before you leave, then the road report, and carry a second plan for a wet day. In winter, the track in winter covers ice and snow on the road.
Find a Tour That Fits Your Day
The Hooker Valley Track needs no booking and no guide. If you have no car, compare day trips from Queenstown, Lake Tekapo and Christchurch by how much time they leave you on the track.
Check Tour Availability